{"id":210,"date":"2023-03-03T12:27:31","date_gmt":"2023-03-03T12:27:31","guid":{"rendered":"https:\/\/track.tecnicasreunidas.es\/tecnicas-reunidas-comienza-los-trabajos-de-ingenieria-para-una-gran-planta-de-hidrogeno-verde\/"},"modified":"2023-03-03T12:29:19","modified_gmt":"2023-03-03T12:29:19","slug":"tecnicas-reunidas-comienza-los-trabajos-de-ingenieria-para-una-gran-planta-de-hidrogeno-verde","status":"publish","type":"post","link":"https:\/\/track.tecnicasreunidas.es\/en\/tecnicas-reunidas-comienza-los-trabajos-de-ingenieria-para-una-gran-planta-de-hidrogeno-verde\/","title":{"rendered":"T\u00e9cnicas Reunidas launches the engineering works for a large-scale green hydrogen plant"},"content":{"rendered":"<div class=\"wpb-content-wrapper\">[vc_row][vc_column][vc_column_text]\r\n<ul>\r\n \t<li>The awarded project, named Catalina and located in Arag\u00f3n (Spain), consists of the\u00a0development of an initial green hydrogen 500 MW plant, expandable to 2 GW. The first\u00a0phase will begin operations in 2027.<\/li>\r\n \t<li>The plant will supply green hydrogen for the decarbonization of large industrial\u00a0consumers on the Mediterranean coast.<\/li>\r\n \t<li>The engineering services commissioned to T\u00e9cnicas Reunidas include the plant configuration study, preparation of documentation and permits, and full cost estimates.<\/li>\r\n<\/ul>\r\n\u00a0[\/vc_column_text][vc_column_text]The Catalina project, developed by Copenhagen Infrastructure\u00a0Partners (CIP), has awarded T\u00e9cnicas Reunidas an engineering contract for the\u00a0development of a large-scale green hydrogen generation plant to be built in Andorra\u00a0(Teruel, Spain).\r\n\r\nThe engineering contract includes the plant configuration study, the preparation of\u00a0relevant technical documentation for permits and a full cost estimate.\r\n\r\nThe first stage of the Catalina project is undertaken by CIP in partnership with Enag\u00e1s\u00a0Renovable, Naturgy and Fertiberia. It involves the development of a 500 MW green\u00a0hydrogen generation plant that will produce more than 50,000 tonnes per year.\r\n\r\nThe hydrogen produced will be transported via a pipeline 221 kilometres long to major\u00a0industrial customers in the Mediterranean area, including a newly built, state-of-the-art\u00a0green ammonia plant with an annual production capacity of up to 247,000 tonnes, as well\u00a0as to other refining facilities and tile companies.\r\n\r\nIt is estimated that in this first stage Catalina will contribute to the avoidance of almost 0.4\u00a0million tonnes of CO2 emissions per year.\r\n\r\nIn a second phase of the project, the green hydrogen production capacity will increase to 2\u00a0GW. This production will cover 30% of Spain\u2019s current demand for green hydrogen.\r\n\r\nJos\u00e9 G\u00f3mez-Arroyo, Catalina Project Director, has stated that \u201cCatalina is a first-of-a-kind\u00a0large scale green hydrogen project that will contribute enormously to the energy transition\u00a0and emissions avoidance of Spanish industry, and to European energy independence.\r\n\r\nCatalina is one of the early-stage large scale projects that\u2019s help make viable the Spanish\u00a0hydrogen backbone infrastructure as well as international interconnectors. Catalina is\u00a0partnering with leading companies in their fields to ensure delivery of this highly complex\u00a0project. We are happy to announce our partnership with T\u00e9cnicas Reunidas and we look\u00a0forward to working with them in the next phase of Catalina\u2019s development.\u00a0Gonzalo Pardo, Commercial Director for Power and the Energy Transition of T\u00e9cnicas\u00a0Reunidas, stressed that \u201cthis contract is yet another example of our company\u2019s firm\u00a0commitment to projects related to energy transition and decarbonisation, as it adds to the\u00a0long list of initiatives that we have been developing for three years in relation to green\u00a0hydrogen, the circular economy and carbon capture\u201d.\r\n\r\n<strong>About CIP<\/strong>\r\n\r\nFounded in 2012, Copenhagen Infrastructure Partners P\/S (CIP) today is the world\u2019s largest\u00a0dedicated fund manager within greenfield renewable energy investments and a global\u00a0leader in offshore wind. The funds managed by CIP focuses on investments in offshore and\u00a0onshore wind, solar PV, biomass and energy-from-waste, transmission and distribution,\u00a0reserve capacity, storage, advanced bioenergy, and Power-to-X.\r\n\r\nCIP manages ten funds and has to date raised approximately EUR 19 billion for investments\u00a0in energy and associated infrastructure from more than 140 international institutional\u00a0investors. CIP will accelerate its role in the global energy transition and aim to have EUR\u00a0100 billion under management in green energy investments in 2030.\r\n\r\nCIP has more than 400 employees and offices in Copenhagen, London, Hamburg, Utrecht,\u00a0New York, Tokyo, Singapore, Seoul, Munich, Luxembourg, and Melbourne.\r\n\r\nFor more information, visit www.cip.dk\r\n\r\n<strong>About T\u00e9cnicas Reunidas<\/strong>\r\n\r\nThe Spanish company T\u00e9cnicas Reunidas is one of the most important companies in its\u00a0sector on an international scale, with a presence in 25 countries and a track record that\u00a0totals more than 1,000 industrial plants throughout its more than 60 years of experience.\r\n\r\nT\u00e9cnicas Reunidas\u2019 activity is mainly focused on the development of engineering projects,\u00a0design and construction of industrial plants for the production of clean fuels, natural gas\u00a0and chemical products, and solutions linked to the energy transition, circular economy and\u00a0decarbonisation (renewable hydrogen, biofuels, waste recovery, CO2 capture and storage,\u00a0etc.).\r\n\r\nIts more than 6,800 employees, most of them highly qualified engineers, make its\u00a0headquarters in Spain a centre of engineering excellence.[\/vc_column_text][\/vc_column][\/vc_row]<!-- \/wp:post-content --><\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] The awarded project, named Catalina and located in Arag\u00f3n (Spain), consists of the\u00a0development of an initial green hydrogen 500 MW plant, expandable to 2 GW. The first\u00a0phase will begin operations in 2027. The plant will supply green hydrogen for the decarbonization of large industrial\u00a0consumers on the Mediterranean coast. The engineering services commissioned to T\u00e9cnicas [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":152,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-210","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categorizar"],"acf":[],"_links":{"self":[{"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/posts\/210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/comments?post=210"}],"version-history":[{"count":1,"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/posts\/210\/revisions"}],"predecessor-version":[{"id":211,"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/posts\/210\/revisions\/211"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/media\/152"}],"wp:attachment":[{"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/media?parent=210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/categories?post=210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/track.tecnicasreunidas.es\/en\/wp-json\/wp\/v2\/tags?post=210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}